1951 AMC 12 Problem 13

Attempt Problem 13 of the 1951 AMC 12 below, then check your answer against the professionally curated solution from LIVE by Po-Shen Loh. You can also try the full timed exam, view all 1951 AMC 12 solutions, or check the answer key.

All problems are used with official legal permission of the Mathematical Association of America (MAA).

13.

AA can do a piece of work in 99 days. BB is 50%50\% more efficient than A.A. The number of days it takes BB to do the same piece of work is:
131213\dfrac12
4124\dfrac12
66
33
None of these answers
Answer: C
Concepts:rateratio and proportion
Small hint:
Translate days per job into jobs per day
Big hint:
Multiply AA’s rate 19\frac{1}{9} by 1.51.5
Solution:
AA’s rate is 19\frac{1}{9} job per day. Thus BB’s rate is 32⋅19=16 \frac32\cdot\frac19=\frac16 job per day, so BB needs 66 days.
Thus, the correct answer is C.
LIVE by Po-Shen Loh
Programs

LIVE Classes

Self-Paced Classes

Stars

Scholarship

About Us

Who Is Po-Shen Loh?

Email Contact

Newsletter

Jobs

Become a Star

For a more Thought Full world.

© 2026 Expii, Inc.